Cisco Systems Release 4.2 Security Camera User Manual


 
1-3
Cisco Video Surveillance Manager Getting Started Guide, Release 4.2/6.2
OL-19733-01
Chapter 1 Overview
Planning for Your Installation
Information Required for Configuring a Multi Services Platform, page 1-4
Information Required for Configuring VSM, page 1-5
Items Required for Installation
Table 1-2 describes the items that a typical installation requires.
Ta b l e 1-2 Required Items
Item Description
Items required for all installations
Power source and power protection. The Multi Services Platform connects
to a standard 110 volt AC outlet.
Network connectivity. The Multi Services Platform connects
to your network with a standard
Category 5 network cable.
The network should be set up and
configured before you begin.
Keyboard, monitor, and mouse. Performing the initial configuration of
the Multi Services Platform requires
you to connect a keyboard, monitor,
and mouse to the device.
You can use a standard PC monitor.
The keyboard and mouse can have
standard 6-pin or USB connectors.
Items required for rack mounting a Multi Services Platform
Rack. The device mounts in a standard
19-inch wide rack. The rack should be
between 30 and 33 inches deep.
For information about appropriate
racks and environments, see the
“Preparing to Rack Mount” section on
page 2-4