1-2 SPARC Enterprise M4000/M5000 Servers Site Planning Guide • April 2007
Facility Power
• Have you determined voltage for server equipment rack and peripheral
equipment racks?
• Have sufficient power receptacles been ordered for each server, monitor, and
peripheral?
• Are the power receptacles within 3.5 meters (11.5 feet) of the equipment rack?
Physical
Specifications
• Has the server location been established?
• Does the equipment floor layout meet the equipment maintenance access
requirements (Section 1.2.2.1, “Size and Space Specifications” on page 1-6)?
• Will the equipment be positioned so that the exhaust air of one device does not
enter the air inlet of another?
Access Route
• Has the access route been checked for clearances of the packaged server
(Section 1.2.3, “Access Route” on page 1-8)?
• Has a proper pallet jack been checked for weight limitation for moving the server
(Section 1.2.3, “Access Route” on page 1-8)?
• Has the elevator been checked for clearances and weight restrictions of the
packaged server (Section 1.2.3, “Access Route” on page 1-8)?
Network
Specification
• Have you determined necessary information for your network connections
(Section 1.2.5, “Network Connection” on page 1-9)?
TABLE 1-1 Preinstallation Requirements (Continued)
Checklist Check