Sterling SSV 05/2R Film Camera User Manual


 
4.1. Prep a ra tions
Check whether the in jec tor tubes are in serted in the ma te rial to be con veyed.
Switch on the com pressed-air sup ply.
Switch on the con veyor unit at the con trol and main te nance unit.
The con veyor unit should now con vey un til the con veyor hop per is filled up to the
level probe.
4.2. Set ting the mix ing ra tio of the com po nents
The mix ing ra tio of the com po nents is ad justed on the pres sure re duc ers.
&
The ad just ment on the pres sure re duc ers will vary ac cord ing
to the ma te rial, flow prop er ties, par ti cle size and con vey ing
distance.
016-4MS
SSV 05/2R
Set-up 22