- 3 -
INITIAL PREPARATIONS
• Determine the operating voltage at the
installation site. The camera‘s Voltage Regulator
Board accepts both 12-24VDC/VAC input
without change to internal connections.
See Section 2, Input Power Connections.
• Determine the optimum location for the camera.
See Section 3, Mounting Specification.
• All cameras have been tested prior to shipment.
After the wiring has been reconnected, it is
advisable to check the camera’s operation
before installation.
GUIDELINES
The installation of the REG-D1 camera is explained in
Sections 1 to 3.
It is important that these steps are followed and to
practice proper installation procedures with proper safety
equipment.