1-2 SPARC Enterprise M4000/M5000 Servers Site Planning Guide April 2007
Facility Power
Have you determined voltage for server equipment rack and peripheral
equipment racks?
Have sufficient power receptacles been ordered for each server, monitor, and
peripheral?
Are the power receptacles within 3.5 meters (11.5 feet) of the equipment rack?
Physical
Specifications
Has the server location been established?
Does the equipment floor layout meet the equipment maintenance access
requirements (Section 1.2.2.1, “Size and Space Specifications” on page 1-6)?
Will the equipment be positioned so that the exhaust air of one device does not
enter the air inlet of another?
Access Route
Has the access route been checked for clearances of the packaged server
(Section 1.2.3, “Access Route” on page 1-8)?
Has a proper pallet jack been checked for weight limitation for moving the server
(Section 1.2.3, “Access Route” on page 1-8)?
Has the elevator been checked for clearances and weight restrictions of the
packaged server (Section 1.2.3, “Access Route” on page 1-8)?
Network
Specification
Have you determined necessary information for your network connections
(Section 1.2.5, “Network Connection” on page 1-9)?
TABLE 1-1 Preinstallation Requirements (Continued)
Checklist Check