6 C1302M-F (11/08)
Install the Power Module
Attach the power module to the mounting surface. Use only installation methods and materials capable of supporting four times the maximum
specified load of the system (220 lb/100 kg).
NOTE: If required, install the optional TXB translator, fiber module, or UTP board before installing the power module. Refer to the installation
instructions supplied with the TXB translator, fiber module, or UTP board for installation instructions.
To install the power module, refer to Figure 2 and do the following:
1. Make sure the threads of the power module and the threads of the supplied M10 x 16 mm stainless steel bolts are free of dirt and debris.
2. Apply a generous amount of thread locking compound (supplied) to the threads of the power module and the threads of the stainless steel
bolts.
3. Face the conduit fitting of the power module towards the mating conduit fitting of the installation.
4. Secure the power module to the mounting surface with the supplied 8 mm Allen wrench and four M10 x 16 mm stainless steel bolts and
lock washers. Tighten the bolts to 25 to 27 ft-lb (34 to 37 Nm). The thread compound supplied must cure for one hour. Allow for this cure
period prior to completing the installation.
Figure 2. Attach Power Module to Mounting Surface
NOTE: Figure 2 shows the power module
being installed on a PXM100 pedestal mount
(not supplied).