Sterling SSE-2 Film Camera User Manual


 
8.10. Com pres sed-air supp ly (only SSE-2 with ac ti ve clea ning)
For ope ra ting the clea ning de vi ce, a com pres sed-air supp ly is ne ces sa ry.
Check com pres sed-air pi ping for cor rect in stal la ti on and as sem bly.
Check fit tings, length and qua li ty of the hose con nec tions for agree ment with re qui re ments.
The ope ra ting pres su re is 5-6 bar (72-87 PSI) (sys tem over pres su re).
Check the com pres sed-air supp lied by the plant’s supp ly net work.
Ad just com pres sed-air pres su re to 5-6 bar (72-87 PSI) (sys tem over pres su re).
Con nect the unit to the plant’s supp ly net work by me ans of a hose.
L
De pres su ri ze com pres sed-air supp ly li nes which must be ope ned.
F
Com pres sed air must be de wa te red, dust free and oil free.
In stall a main ten an ce unit if re qui red.
Ad just pres su re to a max. va lue of 6 bar (87 PSI) (sys tem over pres su re).
8.11. In stal ling the ac ces so ries
F
See chap terAc ces so ries”.
516-4MS
SSE-2
As sem bly in struc tions 8-10