KVH Industries TracVision M5 Security Camera User Manual


 
3
Before you begin, follow these steps to make sure
you have everything you need to complete the
installation.
a. Unpack the box and ensure it contains
everything shown on the Kitpack Contents
List. Save the packaging for future use.
b. Carefully examine all of the supplied parts to
ensure nothing was damaged in shipment.
c. Gather all of the tools and materials listed
below. You will need these items to complete
the installation.
Flat-head and Phillips-head screwdrivers
Electric drill and 3/8" (10 mm), 5/32"
(4 mm), 3/32" (2.25 mm), and #29 bits
3" (80 mm) hole saw
Socket wrenches
7/16" open-end wrench
Light hammer and center punch
•Adhesive tape
Scriber or pencil
Wire strippers and terminal lug crimper
RG-6 or RG-11 RF coax cable(s) with
Snap-N-Seal® F-connectors for
connecting the antenna to the receiver(s)
(see Step 7a on page 9 to determine the
number and type of cables required)
Connector installation tool (Augat IT1000
- KVH part #19-0242)
Power cables for connecting power to the
switchplate and MCP (see Figure 2)
Satellite TV receiver and TV
Radome
Baseplate
Figure 1: TracVision M5 System Components
Antenna
Switchplate
MCP (MultiSat Control Panel)
Always lift the antenna by the baseplate and
never by the radome or any portion of the
internal antenna assembly (see Figure 1).
IMPORTANT!
Figure 2: Guidelines for Power Cables
Cable Length Use Cable Gauge
< 40 ft (12 m)
14AWG (2.5mm
2
)
40-70 ft (12-21 m)
12AWG (4mm
2
)
Inspect Parts and Get Tools