3-4
Loading Documents on the ADF
NOTICE
Be sure to change the position of the shipping lock according to the “Installation and Connection”
procedure before operation.
1
Lift up the ADF paper chute and lock the
bar in its operating position.
Stacker
ADF
ADF paper chute
Guide
Guide lever
ADF lever
Operating position Bar