PLASMON LASER MAGNETIC STORAGE - LF 6600 User Manual
Page 34
Ensure that the site selected for the LF 6600 Tower or Rack Mount configuration is able to support a
volumetric air flow of 3.2 m
3
/min. (112 cfm). For the Rack Mount configuration, the back door of the
enclosing equipment cabinet must have air vents. Ensure that the operating environment is free from dust.
WARNING
To prevent fire or shock hazard, do not expose the LF 6600 to rain or
moisture. Refer servicing to qualified technicians.
In case of fire or other emergency, isolate the units from the main
power by disconnecting the power plugs from their site power
receptacles. In situations where disconnecting the plugs is not
possible or practical, disconnect the system main power to isolate the
units from the main power.Use of controls or adjustments, or
performance of procedures other than those specified herein may
result in exposure to hazardous laser radiation.
Do not stare directly into the laser beam or its reflection on any
reflecting mirror-like surface. Invisible laser radiation can be emitted if
the unit is open and safety interlocks are defeated.
TOWER INSTALLATION
The LF 6600 Tower configuration is shipped as a complete assembly, ready for cable connections and
power up. No tools are required for the installation.
CAUTION
Remove the foam shipping block from the shuttle assembly before
powering on the LF 6600.
To install the Tower configuration:
1) Connect the AC power cord as explained in the Connecting the Power Cord section.
(Refer to the Installation and De-installation section for information regarding the AC
ground.)
2) Connect the host interface SCSI cables and appropriate signal terminators, if required, as
explained in the Installation and de-installation section.