Chapter 2 Setting Up and Configuring the Multi Services Platform
Mounting the Multi Services Platform in a Rack
2-4
Cisco Video Surveillance Manager Getting Started Guide, Release 4.2/6.2
OL-19733-01
Note If your shipment includes more than one Multi Services Platform, make sure that
the serial number of each Multi Services Platform matches the hard drives that are
intended for it, as described in the previous procedure.
Mounting the Multi Services Platform in a Rack
The Multi Services Platform is designed to be installed in a standard 19-inch rack.
The chassis ships with one set of rail assemblies and the mounting screws and
washers that you need to secure the system in a rack.
You also will need a medium size Phillips Head screwdriver and at least two
people to position the Multi Services Platform in a rack.
The following sections describe how to rack mount the Multi Services Platform:
• Preparing to Rack Mount, page 2-4
• Rack Mounting, page 2-6
Preparing to Rack Mount
Before you install the Multi Services Platform in a rack, review the following
guidelines:
Choosing a Location
• Leave approximately 25 inches of clearance in front of the rack to enable you
to open its front door completely, if applicable.
• Leave approximately 30 inches of clearance in back of the rack to allow for
sufficient air flow and ease of servicing.
• The Multi Services Platform is intended for installation in a restricted access
location, such as a dedicated equipment room or service closet.
• Make sure that the rack is in an environment that meets these requirements
for the Multi Services Platform:
–
Operating temperature—50 to 95 °F (10 to 35 °C)
–
Operating humidity—8 to 90% non-condensing