Polycom 2000 Security Camera User Manual


  Open as PDF
of 1183
 
RealPresence Collaboration Server (RMX) 1500/1800/2000/4000 Administrator’s Guide
Polycom®, Inc. 713
2 Select the appropriate Hot Backup Triggers check boxes:
3 Alternatively, click the Trigger Failover Manually button when you want to trigger the Hot Backup
manually and activate the Slave MCU.
A confirmation message is displayed.
4 Click Yes to continue the Hot Backup process or click No to cancel the Hot Backup process.
5 Click OK.
Modifications to the Master MCU Requiring System Reset
Modifications to the configuration of the Master MCU that require a System Reset cannot be performed
while Hot Backup is enabled.
To modify the Master MCU configuration:
1 Disable the Hot Backup on the Master and Slave MCUs.
2 Modify the Master MCUs configuration.
3 Reset the Master MCU.
4 When the reset is complete, enable Hot Backup on the Master and Slave MCUs.
5 If required, reset the Slave MCU.
Hot Backup Triggers
Hot Backup Trigger Description
Lost connection with management
port
Initiates the Hot Backup switch from the Master to the Slave MCU
when the connection to the management port is lost on the Master
MCU. This trigger is always set.
Lost connection with media port Initiates the Hot Backup switch from the Master to the Slave MCU
when the connection with an active media port is lost on the Master
MCU.
Lost connection with signalling port Initiates the Hot Backup switch from the Master to the Slave MCU
when the connection with an active signalling port is inactive for a
duration of 30 seconds on the Master MCU. A system flag,
ETH_INACTIVITY_DURATION, can be added and configured to
modify the duration of inactivity of the signalling port. Default value
is 30 seconds; Minimum value is 20 seconds.
Lost connection with ISDN card Initiates the Hot Backup switch from the Master to the Slave MCU
when the connection with an ISDN card is disconnected on the
Master MCU.