DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
555-230-112
Issue 5
May 1998
Install Management Terminal and Activate System
Page 3-8Activate the System
3
DC-Powered System
1. At the DC Battery Cabinet (if installed), set the circuit breaker to ON.
2. At the DC Power Cabinet, set the circuit breaker(s) on the rectifiers ON.
This starts the system initialization and test. Some red LEDs may be on but
are turned off by other procedures in this chapter.
3. If the system is high or critical reliability, power-up the EPN cabinet first,
then the PPN cabinet.
Always
power up the PPN cabinet
last
.
Verify Messages on Terminal
1. After several minutes, verify all tests pass. Screen 3-1 displays the screen
contents of a typical Release 6r system with 3 memory circuit packs. The
Release 6si system screen is similar.
NOTE:
If any of the terminal messages indicate a test has failed or if the message
spe down mode” is displayed, refer to
DEFINITY Enterprise
Communications Server Release 6 Maintenance for R6r
, or
DEFINITY
Enterprise Communications Server Release 6 Maintenance for R6vs/si
, to
clear the trouble.