Lucent Technologies Release 6 Security Camera User Manual


 
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
555-230-112
Issue 5
May 1998
Install and Wire Telephones and Other Equipment
Page 5-114Add Packet Bus to R6si
5
3. At each EPN, install the appropriate circuit packs. See Table 5-21.
4. Power up EPN2, then EPN1, then the PPN as required.
5. Enter change system-parameters maintenance and press
Enter. Use this
form to enable the packet bus.
6. Perform tests.
Resolve Alarms
Examine the alarm log. Resolve any alarms that may exist using
DEFINITY
Enterprise Communications Server Release 6 Maintenance for R6vs/si
.
Contact INADS to Enable Customer Options and
Verify Alarm Origination
Be sure the system is part of the existing INADS database by calling the INADS
Database Administrator at the Technical Service Center (TSC). Verify that INADS
can dial into the system and that the system can dial out to INADS.
As part of the system registration process, the INADS Database Administrator
enables Alarm Origination and enables customer options.
!
CAUTION:
If you do not enable Alarm Origination when the customer has purchased a
services contract, the system cannot report any alarm to the TSC
automatically, causing the TSC to be unable to fulfill the services contract.
1. Quantity of this pack should equal the number of EPNs.
2. Optional for digital trunk testing.
Table 5-21. Circuit-Pack Locations for Packet Bus in Each EPN
Circuit Pack Carrier Quantity Slot
TN570 Expansion Control Carrier A 1 or 2
1
EXPN INTFC/1 and /2
TN771C Expansion Control Carrier A 1
2
Any Available Port Slot