Install Telecommunications Cabling
Page 2-18Cable Installation
2
Cable Routing Guidelines
General
The following guidelines should be used when installing the equipment room
cabling. Following these guidelines will maximize use of the cable slack
managers and make future cabling additions and changes easier.
Figure 2-10
and Figure 2-11 show typical cable routing from the cabinet to the
top and bottom of the MDF, respectively.
Figure 2-10. Cable Routing to Top Terminal Blocks
Figure Notes:
1. Main Distribution Frame
2. AC Power Cord (AC-Powered
Cabinets Only)
3. Cable Slack Manager Number 1
4. Trunk/Auxiliary Field
5. Station Distribution Field
6. Cable Slack Manager Number 2
7. Cable Slack Manager Number 3
8. System Cabinet(s)
9. To Building Cables
10. 10 AWG (#25) (6 mm
2
) Wire to
Coupled Bonding Conductor
r758424b MMR 052996