Lucent Technologies Release 6 Security Camera User Manual


 
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
555-230-112
Issue 5
May 1998
Test the System
Page 4-12Check Circuit Pack Configuration Again
4
6. Verify the MODEs of the expansion links have changed.
7. If any problems are indicated, check the TDM cables and the inter-
cabinet cables in the associated EPN.
Check Circuit Pack Configuration
Again
1. Verify the screen displays: Command:
2. Type list configuration all and press
Enter.
3. Verify all circuit packs installed in the system are listed in the reports. Refer
to
DEFINITY Enterprise Communications Server Release 6 Maintenance
for R6r
, to resolve any discrepancies.
System Test Completion
Save Translations
If any administration changes have been made, save and make a back up copy
of the translations.
Next Steps
After the basic hardware is installed and tested, 3 more steps must be
completed:
1. Install the telephones and other equipment. See Chapter 5, ‘‘
Install and
Wire Telephones and Other Equipment’’.
2. Administer the features, telephones, and other equipment according to
customer data on the provisioning plan. The data for system and
telephone features can be administered using
DEFINITY Enterprise
Communications Server Release 6 Administration and Feature
Description
.
3. After the system is administered, test the telephones and other equipment
using the procedures in Chapter 6, ‘‘
Test Telephones and Other
Equipment’’.
NOTE:
It may be more efficient to install each hardware component, administer it,
and test it before going on to install another component.