Lucent Technologies Release 6 Security Camera User Manual


 
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
555-230-112
Issue 5
May 1998
Install and Wire Telephones and Other Equipment
Page 5-64Add Circuit Packs
5
Add Circuit Packs
When installing additional features or equipment, it may be necessary to install
additional port circuit packs. See Figure 5-16
for a list of circuit packs. This is a
general procedure to use when adding features or equipment that require adding
circuit packs.
1. Log onto the system and answer y to the
Suppress Alarm Origination
question during login.
2. Install the circuit pack into the carrier.
3. Log off the system after the addition (and any required administration) is
complete.
NOTE:
If North American and non-United States circuit packs appear in the same
row of a table, those circuit pack codes ordinarily used in North America
appear in bold font to help distinguish these circuit packs from their
non-United States counterparts. If only circuit packs commonly used for
non-United States applications appear in a row of a table, the circuit-pack
codes are enclosed in parentheses. If only circuit packs commonly used in
North America appear in a row of a table, the circuit pack codes are
enclosed in square brackets.
For information about connecting and administering non-United States circuit
packs, refer to the Application Notes in
DEFINITY Enterprise Communications
Server Release 6 Administration and Feature Description
.