Cable Ductwork
Page C-8
C
Figure C-4. Assembly of Intercabinet Shielded Ducts
4. Install risers on any other cabinets that require shielded-duct connections.
5. Set a shielded trough ("B") between two cabinet risers (“A”). Push down on
the trough so the slots in the ends of the trough engage the ears at the
corners of the risers. The walls of the trough go inside the walls of the
risers and outside of the ears of the risers.
6. Seat the bottom of the shielded trough on the support walls of the two
cabinet risers that it connects. Attach the trough to each riser with a
self-tapping screw.
7. Install shielded troughs on any other pairs of cabinets that require
shielded-duct connections.