Cisco Systems CL-28826-01 Security Camera User Manual


  Open as PDF
of 2616
 
59-67
User Guide for Cisco Security Manager 4.4
OL-28826-01
Chapter 59 Configuring Router Interfaces
PVC Policy Page
Enable AIS-RDI Detection When selected, alarm indication signal (AIS) cells and remote defect
indication (RDI) cells are used to report connectivity failures at the
ATM layer of the PVC.
When deselected, AIS/RDI cells are disabled.
AIS cells notify downstream devices of the connectivity failure. The
last ATM switch then generates RDI cells in the upstream direction
towards the device that sent the original failure notification.
Down Count The number of consecutive AIS/RDI cells that cause the PVC to go
down. Valid values range from 1 to 60. The default is 1.
Up Count The number of seconds after which a PVC is brought up if no AIS/RDI
cells are received. Valid values range from 3 to 60 seconds. The default
is 3.
Segment Continuity Check settings
Enable Segment Continuity
Check
When selected, OAM F5 continuity check (CC) activation and
deactivation requests are sent to a device at the other end of a segment.
When deselected, segment CC activation and deactivation requests are
disabled.
Note If Configure Continuity Check is deselected in the OAM-PVC
tab, these settings are saved in the device configuration but are
not applied.
Activation Count The maximum number of times that the activation request is sent before
the receipt of an acknowledgement. Valid values range from 3 to 600.
The default is 3.
Deactivation Count The maximum number of times that the deactivation request is sent
before the receipt of an acknowledgement. Valid values range from 3 to
600. The default is 3.
Retry Frequency The interval between activation/deactivation retries, in seconds. The
default is 30 seconds.
End-to-End Continuity Check settings
Enable End-to-End
Continuity Check
When selected, OAM F5 continuity check (CC) activation and
deactivation requests are sent to a device at the other end of the PVC.
When deselected, segment CC activation and deactivation requests are
disabled.
Note If Configure Continuity Check is deselected in the OAM-PVC
tab, these settings are saved in the device configuration but are
not applied.
Activation Count The maximum number of times that the activation request is sent before
the receipt of an acknowledgement. Valid values range from 3 to 600.
The default is 3.
Deactivation Count The maximum number of times that the deactivation request is sent
before the receipt of an acknowledgement. Valid values range from 3 to
600. The default is 3.
Table 59-28 PVC Advanced Settings Dialog Box—OAM Tab (Continued)
Element Description